Permitting & utility coordination · EV charging operations

Get sites permitted and energized on schedule.

Permit packages bounce back from the AHJ over a missing load calc while the interconnection request stalls in the utility queue. The energization date slips unnoticed.

The reality

Energization is a tracking problem.

Every site runs two parallel clocks — the AHJ electrical permit and the utility interconnection. The permit package gets kicked back over a missing single-line diagram or load calc; the interconnection request sits in the utility queue waiting on a service upgrade study. Both stall quietly, and the energization date slips before anyone notices.

The operator owns both tracks end to end — assembles the permit package with the site plan, single-line, and load calc, submits to the AHJ, files and follows the interconnection request, and chases every approval until the meter is set and the site is energized.

How the operator runs permitting & utility coordination

The outcome

−60% of permitting-desk hours off the team

Sites permitted and energized on schedule

  • Permit packages submitted complete, so they don't bounce back from the AHJ
  • Interconnection requests tracked through the utility queue, not forgotten in it
  • Energization dates held because both clocks are chased in parallel

Common questions

Permitting & utility coordination

What does the Permitting & utility coordination operator do?
The operator owns both tracks end to end — assembles the permit package with the site plan, single-line, and load calc, submits to the AHJ, files and follows the interconnection request, and chases every approval until the meter is set and the site is energized.
What impact does the Permitting & utility coordination operator have?
−60% of permitting-desk hours off the team. Sites permitted and energized on schedule
How does the Permitting & utility coordination operator work?
Pulls the site plan, single-line diagram, and load calculation, checks them against AHJ requirements, and flags any gap. Files the utility interconnection request alongside the AHJ permit and tracks both through review and any service upgrade study. Chases permit approval and meter set, confirms the utility has energized the service, and closes the site to commissioning.